Main Article Content

Abstract

— In development ventures, quality, time and cost are the principle factor for its prosperity. Accomplishing great quality in scheduled time and planned cost is one of the harder errand. The utilization of ready mix concrete for the development activities will diminish the time with a little variation in cost. The part of ready mix concrete in huge ventures, high innovation structures, dams, and modern structures and so on keeps on developing quickly. Conforming to the laws ought to be on accomplishing ideal equipment quality and transportation in ready mix concrete. Thus, equipment quality management integrates and continuously interacts with human, technical, financial, and production system in order to achieve efficiency and quality in transportation. This task includes an investigation on factors associated with equipment quality administration and quality transportation which are impacting in ready mix concrete. It clarifies quickly about the question, nature, extent of study, devices utilized for consider, need of study and gathering information from settled ready mix concrete plants in India. This proposal depicts equipment arranging, determination, appropriateness, support administration, wellbeing administration, save part administration, user training, nature of materials, mix design, hardware condition, geography and climate conditions. The major prudent steps for support of equipment have considered for dealing with the upkeep capacity of equipment in the ready mix concrete plants.

Article Details

How to Cite
R. Karthik Prabhu, K. Sampath Kumar, & P. Kulanthaivel. (2018). A study on factors involved in equipment quality and management in ready mix concrete . International Journal of Intellectual Advancements and Research in Engineering Computations, 6(2), 1229–1233. Retrieved from https://ijiarec.com/ijiarec/article/view/634